RLA Monitoring - Dashboard

Status RLA per Area

Akumulasi Penurunan per Asset

Ringkasan Equipment

Equipment Unit Area/Sisi Lokasi Min (mm) Avg (mm) Warning Danger Latest Date Action
(UNIT 1) THICKNESS FIRST LEVEL ECONOMIZER HANGER TUBE UNIT 1 (UNIT 1) SUPERHEATER / FIRST LEVEL ECONOMIZER HANGER TUBE (UNIT 1) SUPERHEATER 1.43 5.09 0 3 19 Jul 2026 Detail
(UNIT 1) THICKNESS WALLTUBE FURNACE SISI KANTOR UNIT 1 (UNIT 1) SISI KANTOR / WALLTUBE (UNIT 1) WALLTUBE SISI KANTOR 2.44 4.21 5 14 23 Jul 2025 Detail
(UNIT 1) THICKNESS WALLTUBE SISI FRONT(TURBIN) UNIT 1 (UNIT 1) SISI FRONT(TURBIN) / WALLTUBE (UNIT 1) WALLTUBE SISI FRONT(TURBIN) 2.33 4.30 4 19 23 Jul 2025 Detail
(UNIT 1) THICKNESS WALLTUBE SISI LAUT UNIT 1 (UNIT 1) SISI LAUT / WALLTUBE (UNIT 1) WALLTUBE SISI LAUT 2.30 4.20 13 22 23 Jul 2025 Detail
(UNIT 1) THICKNESS WALLTUBE SISI REAR(ESP) UNIT 1 (UNIT 1) SISI REAR (ESP) / WALLTUBE (UNIT 1) WALLTUBE SISI REAR (ESP) 2.81 4.28 2 8 23 Jul 2025 Detail